Facility First manages parking lot repair in Atlanta for retail stores, restaurants, offices and shopping centers, from pothole patching and crack sealing to sealcoating, restriping and concrete work. Each job is checked for Georgia 811 locates, city right-of-way permits and ADA parking requirements before a crew is sent.

What is covered in Atlanta

Parking lot repair in Atlanta under a Facility First program covers:

  • Pothole patching and asphalt repair
  • Crack sealing and sealcoating
  • Restriping of stalls, arrows, fire lanes and accessible spaces
  • Concrete sidewalk, curb, wheel stop and dumpster pad repair
  • Trip-hazard grinding and replacement of damaged walkway panels
  • Catch basin and drainage corrections where water ponds on the lot
  • Bollard and parking stop installation or replacement

Licensing and permits in Atlanta

No state license specific to paving or sealcoating could be confirmed on an official Georgia site. The permits and notices below depend on where the work is and how it is done, and each one is confirmed at triage.

Requirement Agency Level Official source
Right-of-Way Permit for any disturbance of the public right-of-way, including sidewalk and driveway apron work and lane closures City of Atlanta Department of Transportation (ATLDOT) City ATLDOT: Right of Way
Locate request to Georgia 811 before excavating with mechanized equipment, at least 3 business days ahead Georgia 811 State Georgia 811: 2026 Excavator Guide
Stormwater management for new development and redevelopment, including managing the first 1.0 inch of rainfall with green infrastructure City of Atlanta Department of Watershed Management City DWM: Post-Development Stormwater Ordinance
Accessible parking spaces under the 2010 ADA Standards whenever a lot is restriped U.S. Department of Justice Federal ADA.gov: Restriping Parking Spaces

Providers’ business credentials and insurance are checked before work is assigned, and any permit or locate ticket number is recorded on the work order.

Codes and local rules

Public right-of-way. ATLDOT states that any disturbance to the public right-of-way requires a permit from the department, and permitted work must follow the city’s standard right-of-way details. Sidewalk and driveway apron repairs in front of an Atlanta location are therefore scoped separately from work on the private lot.

Georgia 811. Georgia 811 must be contacted before excavating with mechanized equipment or planning demolition. The excavator waits at least 3 business days, and a standard locate request is valid for 30 calendar days after its effective date. Jobs that dig, such as base repairs, bollards and drainage work, carry a locate ticket.

Stormwater. The City of Atlanta’s Post-Development Stormwater Management Ordinance, Chapter 74, Article X of the City Code, applies to nearly every type of development and requires new development and redevelopment to manage the first inch of rainfall on site using green infrastructure. Whether a full lot replacement counts as redevelopment is confirmed with the department’s Site Development office before the work is scoped. Patching, crack sealing and sealcoating are scoped as maintenance.

Accessible parking. The Department of Justice states that when a parking facility is restriped, accessible spaces must be provided under the 2010 ADA Standards. A lot with 1 to 25 spaces needs one accessible space, 26 to 50 needs two, and at least one in every six accessible spaces must be van accessible. Access aisles are at least 60 inches wide and signs with the International Symbol of Accessibility are mounted at least 60 inches above the ground.

Preventive maintenance schedule for parking lots

Planned pavement work costs less than full replacement, and small cracks sealed early keep water out of the base before it becomes potholes. Regular inspections also find trip hazards at walkways and curbs before they cause an incident, and the records show when each hazard was found and fixed.

Task Recommended frequency Basis
Walk the lot and walkways for potholes, trip hazards and damaged curbs Monthly Facility First program default, adjusted per site
Seal cracks in asphalt Annually, before winter Facility First program default, adjusted per site
Sealcoat asphalt surfaces Every 2 to 3 years, based on condition Facility First program default, adjusted per site
Restripe stalls, arrows and fire lanes, laying out accessible spaces to the 2010 ADA Standards When markings fade, and after every sealcoat ADA.gov restriping guidance (accessible spaces); frequency is Facility First program default
Check accessible space signs and access aisles Annually Facility First program default, adjusted per site
Clear catch basins and check for ponding Quarterly and after major storms Facility First program default, adjusted per site
Submit a Georgia 811 locate request before any mechanized digging Every job, at least 3 business days ahead; ticket valid 30 calendar days Georgia 811 Excavator Guide
Photograph and log each repair against the lot map Every visit Facility First program default, adjusted per site

The authority having jurisdiction, the manufacturer of any coating or product and the property’s insurer can require more frequent service, and each location’s schedule is set in its program and recorded on every visit.

Seasonal and local conditions

  • Summer heat. Long hot summers soften and oxidize asphalt, which is why sealcoating and crack sealing are part of the plan. Sealcoat and paint need dry weather to cure, so work is scheduled around afternoon thunderstorms.
  • Heavy rain. Intense storms find every low spot on a lot. Ponding areas and clogged catch basins are logged and corrected so water does not undermine the base.
  • Winter freezes. The National Weather Service lists Atlanta’s average first freeze as November 13. Cracks left open through winter can widen with freezing, so crack sealing is done in the fall.
  • Trading hours. Most lots stay open, so work is phased by section or done overnight.

Where Facility First works in Atlanta

Facility First manages parking lot and concrete work for locations across Atlanta’s main retail and business areas, including Buckhead Village, Lenox Square and Phipps Plaza, and Ponce City Market and the BeltLine, as well as Perimeter Mall and Avalon in Alpharetta in the wider metro. Work ranges from small restaurant and bank lots to shopping center fields, corporate campus garages and distribution yards. At shopping centers and mixed-use sites, the lease decides whether the tenant or the landlord is responsible for the lot, so scope is confirmed per site.

How parking lot requests are handled

  1. Request. The location reports a pothole, trip hazard or faded striping through the platform or by phone, with photos where available.
  2. Triage. Facility First confirms scope, priority, lease responsibility, and whether the job needs an ATLDOT permit, a Georgia 811 ticket or accessible space layout.
  3. Dispatch. A vetted Atlanta paving or concrete provider receives the work order, with phasing set to keep the lot open.
  4. Photo close-out. The crew records before and after photos, materials used and the area repaired.
  5. Verification and invoice. The work is checked against the request and invoiced in one format, building a pavement history for each location.

Routine repairs proceed within the approval limits the client sets. Sealcoating, overlays and work above a limit are quoted for approval first.

Security by McCray in Atlanta

Where lot work blocks entrances or leaves a closed section unattended overnight, McCray can post an officer until the work is complete. Security services in Atlanta

Frequently asked questions

Is a permit needed to repair a sidewalk outside a business in Atlanta?

ATLDOT requires a Right-of-Way Permit for any disturbance of the public right-of-way, including sidewalk and driveway apron work. Repairs on the private lot itself are scoped separately.

Does restriping a parking lot in Atlanta trigger ADA requirements?

Yes. The Department of Justice states that a restriped parking facility must provide accessible spaces under the 2010 ADA Standards, including at least one van-accessible space.

Does parking lot work in Atlanta need a Georgia 811 call?

Georgia 811 must be contacted at least 3 business days before excavating with mechanized equipment. Jobs that dig, such as base repairs, bollards and drainage work, carry a locate ticket.

How often should a parking lot in Atlanta be sealcoated?

No code sets a frequency. Facility First programs default to every 2 to 3 years based on condition, with crack sealing each fall and monthly inspections.

Can parking lot repairs be done without closing the store?

Yes. Work is phased by section or scheduled overnight so part of the lot stays open during trading hours.

One pavement record for every Atlanta parking lot.